Plastering (Exterior Walls)

Back portion of the Kitchen

A clear view on the plastering job.

Renovating the Toilet outside the kitchen.

The toilet outside was renovated. Tiles and other fixtures were installed.

Dining Hall

Installation of floor tiles done.

Grills were installed same in the second floor.

Installation of lights were done. Few electrical works left undone.

Kitchen and Kitchen Staff's Quarter

A spacious kitchen.

Shower, toilet & stockroom for kitchen staff.

Two rooms for the kitchen staff. One for male, one for female.

Remaining Work to be Done

Php 293,850 (US$ 6,119.33) Interior and Exterior Paintings.

Php 12,100 (US$ 251.98) Installation of Jalousie Window & Sliding Window